2.15 The Local Plan allocates a number of development sites
for various uses which, because of the size, location and
neighbouring uses of the site and the uses proposed on the
site, require a masterplan. In requiring this approach, the
Borough Council expects the masterplan to provide definition
and meaning to the place which is to be created and to
provide a framework for investment and implementation.
Masterplans must also be sufficiently detailed so the main
environmental effects can be identified.
2.16 The Borough Council will prepare a concept statement
for each of the sites which require a masterplan as set out in
policy DS4 of the Plan. The statement will include an
assessment of the site and local characteristics as well as
addressing design and physical and social infrastructure
requirements. Through the masterplan, prospective
developers will be expected to set out in detail how these
requirements will be met. Masterplans will need to be
prepared in consultation with stakeholders (such as the local
community, service providers. public transport operators and
parish councils), agreed with the Borough Council and must
accord with the concept statement for the site. A
Supplementary Planning Document will be prepared on the
requirements of masterplans.
POLICY
DS4: MASTERPLANS 
Developers will be required to fund the preparation
of a comprehensive masterplan, and accompanying statement for the following
sites:
i) Vinefields Farm, Bury St Edmunds BSE2
ii) Station Hill Redevelopment Area,
Bury St Edmunds BSE6
iii) Land East of Suffolk Business Park,
Bury St Edmunds BSE3
iv) British Sugar site, Compiegne Way,
Bury St Edmunds BSE5
v) Tayfen Road Development Area,
Bury St Edmunds BSE9
vi) West Suffolk Hospital, Bury St Edmunds BSE14
vii) West Suffolk College, Bury St Edmunds BSE16
viii) Western Way Development Area,
Bury St Edmunds BSE17
ix) Hardwick Industrial Estate, Bury St Edmunds BSE1(f)
x) North-West Haverhill HAV2
xi) Hanchett End Business Park, Haverhill HAV3
xii) Land off Crown Land, Ixworth RA2(b)
xiii) Former Fireworks Factory, Chedburgh RA1(b)
Masterplans will also be prepared for any other site
which by virtue of its size, location or proposed mix
of uses is determined by the local planning authority
to require a masterplanning approach.
Masterplans should be agreed and adopted by the
Local Planning Authority following full public consultation before an application
for the relevant site can be approved. It must be based on the concept statement
and will, where appropriate, set out: -
a) The exact site boundaries for the whole
development and individual phases, including
growth beyond the plan period;
b) Defined neighbourhoods and development
parcels for which separate development briefs
will be prepared, including plans to show in
detail how the design principles will be
implemented;
c) Major landscaping and open space proposals to
assimilate new development into the landscape and create new habitats;
d) Bio-diversity plan, including species and habitat
protection, mitigation, compensation and new
habitat creation measures for sustainability;
e) Proposed shopping centres;
f ) Provision of public art;
g) The range and mix of housing types and the level
of affordable housing provision;
h) Density of housing/mix of uses for each
neighbourhood;
i) Location and design principles of employment
sites;
j) Location and design principles of social
infrastructure sites;
k) Pedestrian and cycle links, including access to all
workplaces, shops, and community facilities, as
well as providing access to the surrounding
countryside and open spaces;
l) The basic road network, and links to the existing
highway network;
m) Public transport links and proposals to limit
dependence on the private car. Developer
funding will be required by the masterplan to
ensure revenue funding is secured to enable such
services to run in the medium to long term;
n) Measures to promote sustainable living, including
energy saving designs, innovations in heating and lighting technologies and
waste management measures;
o) The expected phasing and funding release for social
and physical infrastructure and implementation timetable, including beyond the plan period; and
p) How the development will protect the amenity of
adjoining areas by reason of noise, smell,
vibration, overlooking, other pollution or volume
of vehicular activity generated.
Note: Developers should contact the local planning
authority at an early stage of the development process to ascertain the requirements
for a masterplan.
Masterplans should have regard to the content of the
Supplementary Planning Document.
|